HDD Driling
A | GENERAL SCOPE OF WORK |
I | ENGINEERING WORK & DOCUMENTs |
1 | Verify and confirm detailed design the wall thickness of pipeline for HDD section |
2 | Verify and confirm detailed design the minimum allowable bending radius for HDD section |
3 | Verify and confirm calculation of stresses, HDD coating, ect,...for HDD section |
4 | Calculation sheets for construction design (if nessessary) |
II | MATERIAL SUPPLY AND CONSTRUCTION WORK |
2.1 | All materials (exluding pipeline material & other material supplied by PTSC), construction activities shall be followed in full compliance with Owner’S and/or CONTRACTOR’S standards & specifications |
2.2 | Main material : Pipeline material, cathodic protection, FOC system |
2.3 | Sand, gravel, crushed stone and filling soil, bentonite etc. for temporary and permanent usage, if required |
2.4 | Setting out for construction & pipeline directional drilling works |
2.5 | Drilled hole-HDD work: |
■ The work shall include, but not be limited to complete pilling work, base cleaning etc. | |
2.6 | Bentonite slurry |
■ Submition all material's quanlity certificates | |
■ Final inspection | |
■ Mixing, using, re-using, collection and remove of waste | |
■ Other related works | |
2.7 | Miscellanous: |
■ Grouting of pipelines (if required) | |
■ All other matertial work and associated activities until the completion of HDD Work | |
2.8 | Repair of damaged portion of the road, chanel, bridge,... caused by caused by the Subcontractor’s faulty activities |
2.9 | All other miscellaneous material and consumable to complete HDD work. |
2.10 | Disposal of any waste materials arising from the HDD operation in accordance with the prevailing rules and regulations of the Owner/ local government. |
2.11 | Survey work |
■ Maintenance and control of base bench mark | |
■ Maintenance and provide temporary marking for Pipeline location. | |
■ Preparing of Pile Location Report | |
■ Survey for bench mark checking and adjustment, which is given by Contractor/Owner | |
3. | TEST AND INSPECTION |
3.2 | Elevation and location checking |
3.3 | Concrete mixing, bentonite slurry,.. inspection & test |
3.4 | Test of concrete, sand, aggregate and water as per specification (if any) |
3.5 | Welding inspection, if any |
3.6 | Performing check and inspection in accordance with the construction specification & ITP (Inspection & Test Plan) |
IV | MANPOWER OF CONSTRUCTION, HSE, QA/QC... FOR MANAGEMENT, EXECUTION |
B | DETAIL SCOPE OF WORK |
I | MANAGEMENT, LOGISTICS, & SITE PREPARATION |
1 | Peformamce with Client safety management plan. |
2 | Overall security responsibility for the work sites. |
3 | Management of any permit to work systems. |
4 | Provision of all required medical support for the work. |
5 | Visas, work permits or any permits related for HDD personnel. |
6 | Provide transport and cranes for transport of equipment from base to site and site to site. |
7 | Provide transportation both on and off site for HDD personnel. |
8 | Preparation of site boundaries including site fencing and access gates. |
9 | Prepare access route along main road suitable for mob of HDD equipment. |
10 | Prepare suitable stable platform for rig and equipment, as per design in the site-specific construction procedures. |
11 | Construction of water of drilling fluid storage ponds or bunded areas for expected displacement and spoil requirements. |
12 | Obtain additional work area if required and stated in the site-specific construction procedures. |
13 | Provide and install dead man for rig anchor at each HDD site as per design. |
14 | Provide traffic control personnel, signage, lighting, and barriers as required by project HSE. |
15 | Provide site security, site office and mess for HDD use, waste skips for general and oily waste, site lighting, site welfare, and mess facilities. |
II | PRE-CONSTRUCTION |
1 | Sub-Contractor supplied equipment, employe insurances and medical cover. |
2 | Provide Contractor’s All-Risk insurance for the works as specified. |
3 | Provide alignment drawings, design detail and data sufficient to design & execute HDD works. |
4 | Identify type, size and location of existing underground utilities in proximity to each crossing. |
5 | Sufficient topographic and geotechnical surveys to allow for HDD design and methodology. |
6 | Provide profile design drawings for technical approval. |
7 | Provide HDD engineering including pull force, over-bend design, rig anchor design (Including FOC system pull back) |
8 | Provide design of HDD rig anchor/deadman. |
9 | Prepare construction, environmental / HSE plans, and JSEA for the HDD scope of work. |
10 | Review / comment HDD engineering, design, methodology, and procedures. |
11 | Identify & obtain permits, licenses, permission, including landowner / department negotiation. |
12 | Mobilisation of equipment in Country |
13 | Customs clearance and duties. |
14 | Obtain transport permits, passes, and authorizations for movement of HDD equipment. |
15 | Alignment and construction survey machines. |
16 | Survey HDD rig alignment and coil survey and set out. |
III | DRILLING OPERATIONS |
1 | Provide all HDD drilling equipment required to execute the drilling works excluding Client provided items. |
2 | Provide spare parts and maintenance to ensure continuous reliability of HDD equipment. |
3 | Provide all ancillary equipment and power supply |
4 | Supply fuel and refuelling of all HDD plant and equipment as estimated |
5 | Inspection and pre-project testing of HDD plant and equipment. |
6 | Provide due expertise, engineering, supervision, HSE, and management for all HDD operations. |
7 | Provide all drilling personnel mobilisation to project. |
8 | Provide qualified safety advisors if required during drilling operations. |
9 | Perform down-hole surveying for HDD sections. |
10 | Complete pilot hole, reaming and product pipe installation and FOC strings |
11 | Provide all down-hole tooling and drilling consumables. |
12 | Supply drilling fluids and drill fluid additives required to carry out drilling operations except |
13 | Supply fresh water to site or extract water from a suitable water source or mains supply at the rates |
14 | On-site monitoring of drilling frac-outs or in advertent returns to the surface. |
15 | Provide pumping and hose equipment and personnel to respond to frac-outs to the surface. |
16 | Provide liquid waste truck or vacuum truck to transport frac out waste to rig sites for processing on each site. |
17 | Supply of emergency major spill equipment as required by the project. |
18 | Locate suitable dumpsites and comply with environmental regulations for waste drilling fluid |
19 | Transport and disposal of used drilling fluids and cuttings |
20 | Provide ‘as-built’ drawings for the installed directional drills. |
21 | Site clean-up on completion of HDD works. |
22 | Site reinstatement after tie-in activities. |
23 | Provide transport and cranes for demobilisation of equipment from site to site. |
24 | Submit daily work activity report to Client |
IV | PIPE STRING FABRICATION & FIBER OPTIC COMNUNICATIONS (FOC) SYSTEM |
1 | String, weld, coat, NDT and pre/post hydo-test pipe section to be installed by HDD in a single string. |
2 | Provide pipe rollers and roller cradles for stringing and crawler/mobile crane |
3 | Position string on rollers and crawler/mobile crane |
4 | Provide pulling heads to HDD design. |
5 | Weld pulling heads to pipe string. |
6 | Install HDD's supplied rope during hydro-test dewatering for buoyancy control pipe (where required). |
7 | Provide plant to form calculated over-bend. |
8 | Control and supervision of HDD pipe string overbend during pullback into the completed borehole. |
9 | Monitoring of installation forces during installation of product pipe into drilled hole. |
10 | QC, holiday detection and coating repair during pullback. |
11 | Coating integrity testing after installation. |
12 | Monitoring of pipeline during pullback operations (Pipeline & FOC strings) |
13 | Tie-ins including pits and reinstatement |
14 | Installation permanent cathodic protection measures for installed HDD pipe strings. |
15 | Supply & Install FOC system to Pipe string before pull back on HDD pipe strings. |